Location: Saskatoon
Risk: Low risk project
Material: Asbestos siding
Challenges: Narrow space in between houses and tall height on two-storey home
PPE (Personal Protective Equipment): Half mask with P100 filters, disposable cover-alls
Solutions: On site construction of scaffolding, waste kept in heavy duty double bags, transfer to landfill with special permit
Duration: 3 days